Indonesia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "cobalt 32 dia 16"
Specification Tables
1 Hasil
Drill Bits & Drill Bit Sets
118 Items
Overall Length
4-7/16 in, 4-3/8 in, 4-1/2 in, 4-5/8 in, 4-3/4 in
Finish/Coating
Bright (Uncoated), Bright (Zn-coated), Straw/Bronze, Black Oxide, Black & Gold
Flute Length
2-9/16 in, 2-5/8 in, 2-11/16 in, 2-15/16 in, 3-3/8 in
Drill Diameter
#41, #46, #48, #58, #59
-
Produk
92 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 1 of 2
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
MOQ: 2
Rp
1.058.391
YG-1 Tool Company 2
32
57 End Mill Ujung Kotak: Kobalt, 3 Flute,
Dia
meter Mill 1/
16
", Loc 5/
32
", Oal 1-3/
32
"
MOQ: 2
Rp
1.290.977
YG-1 Tool Company 2
32
57CC Square End Mill: Kobalt, Berlapis TiCN, 3 Flute,
Dia
meter Mill 1/
16
", LOC 5/
32
", OAL 1-3/
32
"
Rp
3.081.147
Osg 5707200 Ball End Mill: Kobalt, Ujung Ganda, 2 Flute,
Dia
meter Mill 1/
16
", Loc 3/
32
", OAL 2"
Rp
2.952.483
Osg 5717800 Ball End Mill: Kobalt, Ujung Ganda, 2 Flute,
Dia
meter Mill 5/
32
", Loc 7/
16
", Oal 2-1/4"
Rp
2.928.358
Osg 5708000 End Mill Ujung Bola: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Frais 3/
16
", Panjang Potong 9/
32
", Panjang Keseluruhan 2"
MOQ: 3
Rp
804.197
YG-1 Tool Company 22277 Mata Bor Ujung Persegi: Kobalt, 3 Alur,
Dia
meter Mata Bor 7/
32
", Loc 5/
16
", Panjang Total 1-13/
32
"
MOQ: 3
Rp
804.197
YG-1 Tool Company 22257 Mata Bor Ujung Persegi: Kobalt, 3 Alur,
Dia
meter Mata Bor 1/
16
", Loc 3/
32
", Panjang Total 31/
32
"
MOQ: 3
Rp
815.005
YG-1 Tool Company 22273 Mata Bor Ujung Persegi: Kobalt, 3 Alur,
Dia
meter Mata Bor 3/
16
", Loc 9/
32
", Panjang Keseluruhan 1-11/
32
"
MOQ: 2
Rp
1.585.993
Osg 5409200 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 7/
32
", Lokator 9/
16
", Panjang Total 2-7/
16
"
MOQ: 2
Rp
1.551.845
Osg 5209100 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 5/
32
", Lokator 7/
16
", Panjang Total 2-5/
16
"
MOQ: 2
Rp
1.551.375
Osg 5209300 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 9/
32
", Lok 9/
16
", Panjang Total 2-5/
16
"
MOQ: 2
Rp
1.556.074
Osg 5209400 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 11/
32
", Lokator 9/
16
", Panjang Total 2-5/
16
"
MOQ: 2
Rp
1.063.649
YG-1 Tool Company 2
32
73 Square End Mill: Kobalt, 3 Flute,
Dia
meter Mill 3/
16
", Loc 7/
16
", Oal 1-21/
32
"
MOQ: 2
Rp
1.949.557
Osg 5209500 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 13/
32
", Lokasi 13/
16
", Panjang Total 2-1/2"
MOQ: 2
Rp
1.951.750
Osg 5209700 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 15/
32
", Lokasi 13/
16
", Panjang Total 2-1/2"
MOQ: 2
Rp
1.283.519
YG-1 Tool Company 22273CC Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 3 Alur,
Dia
meter Mata Bor 3/
16
", Lok 9/
32
", Panjang Keseluruhan 1-11/
32
"
MOQ: 2
Rp
1.235.430
YG-1 Tool Company 22273CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 3 Alur,
Dia
meter Mata Bor 3/
16
", Loc 9/
32
", Panjang Keseluruhan 1-11/
32
"
MOQ: 2
Rp
1.268.638
YG-1 Tool Company 22277CC Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 3 Alur,
Dia
meter Mata Bor 7/
32
", Lokator 5/
16
", Panjang Total 1-13/
32
"
MOQ: 2
Rp
1.236.213
YG-1 Tool Company 22277CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 3 Alur,
Dia
meter Mata Bor 7/
32
", Loc 5/
16
", Panjang Total 1-13/
32
"
MOQ: 2
Rp
1.283.519
YG-1 Tool Company 22257CC Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 3 Alur,
Dia
meter Mata Bor 1/
16
", Lokator 3/
32
", Panjang Total 31/
32
"
MOQ: 2
Rp
1.235.430
YG-1 Tool Company 22257CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 3 Alur,
Dia
meter Mata Bor 1/
16
", Loc 3/
32
", Panjang Total 31/
32
"
MOQ: 2
Rp
1.218.043
YG-1 Tool Company 01291 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 5/
32
", Loc 7/
16
", Panjang Total 2-5/
16
"
MOQ: 2
Rp
1.218.043
YG-1 Tool Company 01299 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 9/
32
", Loc 9/
16
", Panjang Total 2-5/
16
"
MOQ: 2
Rp
1.228.694
YG-1 Tool Company 01303 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 11/
32
", Loc 9/
16
", Panjang Total 2-5/
16
"
MOQ: 2
Rp
1.218.043
YG-1 Tool Company 04295 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 7/
32
", Loc 9/
16
", Panjang Total 2-7/
16
"
MOQ: 2
Rp
1.294.953
YG-1 Tool Company 07295 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 7/
32
", Loc 9/
16
", Panjang Total 2-7/
16
"
MOQ: 2
Rp
1.290.977
YG-1 Tool Company 2
32
73CC Square End Mill: Kobalt, Berlapis TiCN, 3 Flute,
Dia
meter Mill 3/
16
", Loc 7/
16
", OAL 1-21/
32
"
MOQ: 2
Rp
1.637.371
Osg 5627200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 1/
16
", Lokator 3/
32
", Panjang Total 2"
MOQ: 2
Rp
1.637.371
Osg 5628000 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 3/
16
", Lokasi 9/
32
", Panjang Total 2"
MOQ: 2
Rp
1.779.758
Osg 5667200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/
16
", Lokator 3/
32
", Panjang Total 2"
MOQ: 2
Rp
1.691.099
Osg 5668000 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/
16
", Lokasi 9/
32
", Panjang Total 2"
MOQ: 2
Rp
1.585.993
Osg 5409100 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 5/
32
", Jarak 7/
16
", Panjang Total 2-3/8"
MOQ: 2
Rp
1.585.993
Osg 5409300 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 9/
32
", Jarak 11/
16
", Panjang Total 2-1/2"
Rp
4.952.369
Osg 5227400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 21/
32
", Lokasi 1-5/
16
", Panjang Total 5"
Rp
4.952.369
Osg 5227500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 23/
32
", Lokasi 1-5/
16
", Panjang Total 5"
MOQ: 2
Rp
1.059.009
YG-1 Tool Company 2
32
65 End Mill Ujung Persegi: Kobalt, 3 Flute,
Dia
meter Mill 1/8", LOC 5/
16
", OAL 1-11/
32
"
MOQ: 2
Rp
1.934.990
Osg 5429100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/
32
", Lokasi 7/
16
", Panjang Total 3-1/8"
MOQ: 2
Rp
1.962.245
Osg 5429200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/
32
", Lokator 9/
16
", Panjang Total 3-1/4"
MOQ: 2
Rp
2.004.068
Osg 5429300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 9/
32
", Jarak 11/
16
", Panjang Total 3-3/8"
MOQ: 2
Rp
1.712.716
Osg 5637800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 5/
32
", Lokator 7/
16
", Panjang Total 2-1/4"
MOQ: 2
Rp
2.027.408
Osg 5687200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/
16
", Lokator 7/
32
", Panjang Total 2-1/2"
Rp
5.857.129
Osg 5227600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 25/
32
", Lokasi 1-9/
16
", Panjang Total 5-1/2"
MOQ: 2
Rp
2.002.502
Osg 5229100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 5/
32
", Lokator 7/
16
", Panjang Total 3-1/8"
MOQ: 2
Rp
2.016.443
Osg 5229300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 9/
32
", Lokator 9/
16
", Panjang Total 3-1/8"
MOQ: 2
Rp
1.992.477
Osg 5229400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11/
32
", Lokator 9/
16
", Panjang Total 3-1/8"
Rp
3.319.855
Osg 5229500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 13/
32
", Lokasi 13/
16
", Panjang Total 3-3/4"
Rp
3.367.004
Osg 5229700 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 15/
32
", Lokasi 13/
16
", Panjang Total 3-3/4"
MOQ: 2
Rp
1.211.307
YG-1 Tool Company 49272 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 3/
16
", Loc 9/
32
", Panjang Keseluruhan 2"
Rp
3.019.730
YG-1 Tool Company 1
32
95CC Square End Mill:
Cobalt
, Dilapisi Ticn, Ujung Ganda, 4 Flute,
Dia
meter Mill 7/
32
", Loc 9/
16
MOQ: 2
Rp
1.859.802
Cleveland C
32
894 Square End Mill:
Cobalt
, Dilapisi Ticn, Ujung Ganda, 2 Flute,
Dia
meter Mill 11/
32
", Loc 9/
16
MOQ: 2
Rp
1.945.484
Cleveland C
32
980 Square End Mill:
Cobalt
, Dilapisi Ticn, Ujung Ganda, 4 Flute,
Dia
meter Mill 7/
32
", Loc 9/
16
MOQ: 2
Rp
1.885.491
Osg 5409500 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 13/
32
", Lokasi 1", Panjang Total 2-11/
16
"
MOQ: 2
Rp
1.552.785
Osg 5209200 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 7/
32
", Lokator 1/2", Panjang Total 2-5/
16
"
MOQ: 2
Rp
1.767.853
YG-1 Tool Company 07295CC Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 4 Alur,
Dia
meter Mata Bor 7/
32
", Lok 9/
16
", Panjang Total 2-7/
16
"
MOQ: 2
Rp
1.701.594
Cleveland C52158 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11/
32
", Lokator 9/
16
", Panjang Total 3-1/2"
MOQ: 2
Rp
1.763.467
Cleveland C52173 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/
32
", Lokator 9/
16
", Panjang Total 3-1/4"
MOQ: 2
Rp
1.518.637
YG-1 Tool Company 01308 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 13/
32
", Loc 13/
16
", Panjang Total 2-1/2"
MOQ: 2
Rp
1.518.637
YG-1 Tool Company 013
16
Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 15/
32
", Loc 13/
16
", Panjang Total 2-1/2"
MOQ: 2
Rp
1.222.272
YG-1 Tool Company 04291 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 5/
32
", Loc 7/
16
", Panjang Total 2-3/8"
MOQ: 2
Rp
1.224.935
YG-1 Tool Company 04299 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 9/
32
", Loc 11/
16
", Panjang Total 2-1/2"
Pencarian Terkait "cobalt 32 dia 16"
cobalt
31
32
dia
cobalt
11
32
dia
cobalt
15
32
dia
cobalt
flute
32
dia
cobalt
64
dia
32
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
1
2
Atas