Indonesia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "end 64 dia"
Specification Tables
3 Hasil
Radius End Mills
3367 Items
Shank Diameter
7/32", 9/32", 5/8", 1/4", 3/4"
Outer Diameter
0.3125", 5/16", 0.125", 1/8", 1/8", 0.125", 1/16", 0.0625", 1/32", 0.03125"
Flute Length
1.23", 0.0268", 0.0398", 0.0531", 3/16", 0.1875"
Overall Length
115 mm, 3 1/4", 4 1/4", 2 1/4", 6"
R Size
0.015", 0.02", 0.0156", 0.0313", 0.0469"
Ball End Mills
1627 Items
Shank Diameter
1", 3/16", 1 1/4", 3/8", 1/2"
Flute Length
7/16", 0.4375", 1.375", 1 3/8", 1.3125", 1 5/16", 0.098", 4.2 mm
Overall Length
4 5/8", 4 3/4", 150 mm, 4 1/4", 2 1/2"
R Size
0.03", 0.19", 0.25", 0.06", 0.12"
Number of Flutes
7, 6, 3, 2, 4
Square End Mills
941 Items
Shank Diameter
3/8", 1/4", 7/8", 3/16"
Outer Diameter
1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32", 0.1875", 3/16"
Flute Length
0.75", 3/4", 1/2", 0.5", 3/8", 0.375", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
2, 5, 8, 6
Brands
4 Hasil
OSG
351 Produk
APPROVED VENDOR
212 Produk
YG-1 TOOL COMPANY
146 Produk
Cleveland
59 Produk
Kategori
1 Hasil
Springs
3 Produk
Produk
773 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 6 of 13
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
MOQ: 2
Rp
1.657.735
251-002030B Mata Bor Ujung Persegi: Karbida, Dilapisi Altin, 4 Alur,
Dia
meter Mata Bor 5/
64
", Loc 1/2"
Rp
4.072.202
Cleveland C33834 Square
End
Mill: Baja Kecepatan Tinggi, Dilapisi Ticn, 2 Flute,
Dia
meter Mill 39/
64
", Loc 1-1/8"
MOQ: 2
Rp
1.393.168
236-001075 Mata Bor Ujung Persegi: Karbida, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 15/
64
", Loc 1/2", Panjang Total 2-1/2"
MOQ: 2
Rp
1.247.212
Osg 404-1094-BN11 Ball
End
Mill: Karbida, Berlapis TiAlN, 4 Alur,
Dia
meter Mill 7/
64
", Loc 3/8", OAL 1-1/2"
MOQ: 2
Rp
1.776.872
Osg 404-2031-BN11 Ball
End
Mill: Karbida, Berlapis Tialn, 4 Alur,
Dia
meter Mill 13/
64
", LOC 5/8", OAL 2-1/2"
MOQ: 2
Rp
2.005.592
Osg 404-2656-BN11
End
Mill Ujung Bola: Karbida, Dilapisi Tialn, 4 Flute,
Dia
meter Mill 17/
64
", Loc 3/4", Oal 2-1/2"
MOQ: 2
Rp
1.255.254
Osg 403-1094-BN11 Ball
End
Mill: Karbida, Dilapisi TiAlN, 3 Alur,
Dia
meter Mill 7/
64
", LOC 3/8", OAL 1-1/2"
MOQ: 2
Rp
1.488.092
YG-1 Tool Company 11300 Square
End
Mill: Cobalt, Double
End
, 2 Flute, 19/
64
" Mill
Dia
, 9/16" Loc, 3-1/8" Oal
MOQ: 2
Rp
1.491.852
YG-1 Tool Company 12300 Square
End
Mill: Cobalt, Double
End
, 4 Flute,
Dia
meter Mill 19/
64
", Loc 3/4", Panjang Total 3-1/2"
Rp
4.717.756
Osg 70200416 Pisau Frais Ujung Persegi: Karbida, Berlapis Berlian, 2 Alur,
Dia
meter Pisau 5/
64
", Panjang Potong 1/4", Panjang Keseluruhan 1-3/4"
Rp
5.006.478
Osg 70100416 Pisau Frais Ujung Bola: Karbida, Berlapis Berlian, 2 Alur,
Dia
meter Pemotong 5/
64
", LOC 1/4", OAL 1-3/4"
MOQ: 2
Rp
1.476.087
Osg 414-0312-BN Ball
End
Mill: Karbida, 4 Flute, 1/32" Mill
Dia
, 5/
64
" Loc, 1-1/2" Oal
MOQ: 2
Rp
1.140.817
Osg 412-1094-BN Ball
End
Mill: Karbida, 2 Flute, 7/
64
"
Dia
meter Pisau, 7/32" Loc, 1-1/2" Oal
Rp
6.008.887
Osg 82201821
End
Mill Radius Sudut: Karbida, Berlapis Duarise, 4 Alur,
Dia
meter Frais 7/16", Panjang Pemotongan 35/
64
"
MOQ: 2
Rp
2.083.642
Cleveland C76001 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,005", Lokator 1/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.808.267
Cleveland C76013 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,018", Lokator 3/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.662.904
Cleveland C76014 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,02", Lokator 3/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.686.243
Cleveland C76019 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,029", Lokator 5/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.677.158
Cleveland C76021 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,031", Lok 5/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.527.722
Cleveland C76024 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,04", Lokator 7/
64
", Panjang Total 1-1/2"
Pencarian Terkait "end 64 dia"
end
63
64
dia
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
MOQ: 2
Rp
1.462.090
Cleveland C76027 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,05", Lok 9/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.454.258
Cleveland C76029 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,06", Jarak 11/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76033 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,07", Jarak 13/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.440.473
Cleveland C76036 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,08", Jarak 15/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76038 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,09", Jarak 17/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.382.203
Cleveland C76041 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,1", Jarak 19/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76043 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,12", Jarak 23/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.831.763
Cleveland C76057 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,01", Lokator 1/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.663.374
Cleveland C76063 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,02", Lokator 3/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.589.596
Cleveland C76066 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,03", Lok 5/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.527.722
Cleveland C76070 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,04", Lokator 7/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.527.722
Cleveland C76073 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,05", Lok 9/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.452.378
Cleveland C76075 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,06", Jarak 11/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76079 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,07", Jarak 13/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76082 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,08", Jarak 15/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.382.203
Cleveland C76084 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,09", Jarak 17/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76087 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,1", Jarak 19/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.372.491
Cleveland C76089 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,12", Jarak 23/
64
", Panjang Total 1-1/2"
Rp
3.618.726
Osg 402-453111 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 2 Alur,
Dia
meter Mata Bor 29/
64
", Lokasi 1", Panjang Total 3"
Rp
3.645.668
Osg 402-484411 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 2 Alur,
Dia
meter Mata Bor 31/
64
", Lokasi 1", Panjang Total 3"
Rp
3.618.726
Osg 404-453111 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 29/
64
", Lok 1", Panjang Total 3"
Rp
3.645.668
Osg 404-484411 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 31/
64
", Lokasi 1", Panjang Total 3"
MOQ: 2
Rp
1.336.133
219-021065
End
Mill Ujung Bola: Karbida, Berlapis TiCN, 2 Alur,
Dia
meter Mill 13/
64
", LOC 3/8", OAL 2"
MOQ: 2
Rp
1.344.639
219-021075 Pisau Frais Ujung Bola: Karbida, Berlapis Ticn, 2 Alur,
Dia
meter Frais 15/
64
", Panjang Potong 7/16", Panjang Total 2"
MOQ: 2
Rp
1.180.870
220-011055 Pisau Frais Ujung Bola: Karbida, Berlapis TiN, 4 Flute,
Dia
meter Frais 11/
64
", LOC 5/16", OAL 2"
MOQ: 2
Rp
1.200.355
220-021055 Ball
End
Mill: Karbida, Berlapis TiCN, 4 Alur,
Dia
meter Pemotong 11/
64
", Panjang Potong 5/16", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.336.133
220-021065 Ball
End
Mill: Karbida, Berlapis TiCN, 4 Alur,
Dia
meter
End
Mill 13/
64
", Panjang Pemotongan 3/8", Panjang Total 2"
MOQ: 2
Rp
1.191.695
223-001055 Ball
End
Mill: Karbida, Dilapisi TiN, 4 Alur,
Dia
meter Pemotong 11/
64
", Panjang Potong 9/16", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.708.209
Osg 403-2362-BN11 Ball
End
Mill: Karbida, Berlapis TiAlN, 3 Flute,
Dia
meter Mill 6 Mm, LOC 19 Mm, OAL
64
Mm
Rp
3.881.100
Cleveland C33775 Square
End
Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 2 Flute,
Dia
meter Mill 35/
64
", Loc 1-1/8"
MOQ: 2
Rp
1.148.494
Osg 402-0781 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 5/
64
", Lokator 1/4", Panjang Total 1-1/2"
MOQ: 2
Rp
1.148.494
Osg 402-1094 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 7/
64
", Lokator 3/8", Panjang Total 1-1/2"
MOQ: 2
Rp
1.485.899
Osg 402-2031 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 13/
64
", Lokator 5/8", Panjang Total 2-1/2"
MOQ: 2
Rp
1.500.623
Osg 402-2344 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 15/
64
", Lokator 3/4", Panjang Total 2-1/2"
MOQ: 2
Rp
1.523.336
Osg 402-2656 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 17/
64
", Lokator 3/4", Panjang Total 2-1/2"
MOQ: 2
Rp
1.553.568
Osg 402-2969 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 19/
64
", Lokasi 13/16", Panjang Total 2-1/2"
MOQ: 2
Rp
1.836.306
Osg 402-3281 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 21/
64
", Lokator 7/8", Panjang Total 2-1/2"
MOQ: 2
Rp
1.893.480
Osg 402-3594 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 23/
64
", Lokator 7/8", Panjang Total 2-1/2"
MOQ: 2
Rp
1.137.059
Osg 403-0781 Mata Bor Ujung Persegi: Karbida, 3 Alur,
Dia
meter Mata Bor 5/
64
", Lokator 1/4", Panjang Total 1-1/2"
MOQ: 2
Rp
1.124.998
Osg 403-1094 Mata Bor Ujung Persegi: Karbida, 3 Alur,
Dia
meter Mata Bor 7/
64
", Lokator 3/8", Panjang Total 1-1/2"
1
4
5
6
7
8
13
Atas