Indonesia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "mill flute 64 dia"
Specification Tables
2 Hasil
Ball End Mills
1627 Items
Shank Diameter
1", 3/16", 1 1/4", 3/8", 1/2"
Flute Length
7/16", 0.4375", 1.375", 1 3/8", 1.3125", 1 5/16", 0.098", 4.2 mm
Overall Length
4 5/8", 4 3/4", 150 mm, 4 1/4", 2 1/2"
R Size
0.03", 0.19", 0.25", 0.06", 0.12"
Number of Flutes
7, 6, 3, 2, 4
Square End Mills
941 Items
Shank Diameter
3/8", 1/4", 7/8", 3/16"
Outer Diameter
1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32", 0.1875", 3/16"
Flute Length
0.75", 3/4", 1/2", 0.5", 3/8", 0.375", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
2, 5, 8, 6
Brands
4 Hasil
OSG
351 Produk
APPROVED VENDOR
196 Produk
YG-1 TOOL COMPANY
146 Produk
Cleveland
59 Produk
Produk
752 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 5 of 13
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
MOQ: 2
Rp
1.082.861
205-001063 Mata Bor Ujung Persegi: Karbida, Dilapisi Altin, 3 Alur,
Dia
meter Mata Bor 7/
64
", Loc 3/8
MOQ: 3
Rp
791.979
205-001043 Mata Bor Ujung Persegi: Karbida, Dilapisi Altin, 3 Alur,
Dia
meter Mata Bor 5/
64
", Loc 1/4"
MOQ: 3
Rp
813.282
205-001023 Mata Bor Ujung Persegi: Karbida, Dilapisi Altin, 3 Alur,
Dia
meter Mata Bor 3/
64
", Loc 1/8"
MOQ: 2
Rp
1.511.432
204-021181 Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 2 Alur,
Dia
meter Mata Bor 17/
64
", Loc 3/4"
MOQ: 3
Rp
791.979
203-001052 Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 4 Alur,
Dia
meter Mata Bor 7/
64
", Loc 7/32
MOQ: 3
Rp
791.979
203-001032 Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 4 Alur,
Dia
meter Mata Bor 5/
64
", Loc 5/32
MOQ: 3
Rp
813.282
203-001012 Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 4 Alur,
Dia
meter Mata Bor 3/
64
", Loc 3/32
MOQ: 2
Rp
1.974.199
Osg 404-2756-BN11 Ball End
Mill
: Karbida, Berlapis Tialn, 4
Flute
,
Dia
meter
Mill
ing 7 Mm, Loc 19 Mm, Oal
64
Mm
MOQ: 2
Rp
1.465.379
Osg 424-078111 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/
64
", Loc 5/32"
MOQ: 2
Rp
1.463.656
Osg 424-046911 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/
64
", Loc 3/32"
Rp
4.072.202
Cleveland C33834 Square End
Mill
: Baja Kecepatan Tinggi, Dilapisi Ticn, 2
Flute
,
Dia
meter
Mill
39/
64
", Loc 1-1/8"
Rp
2.904.543
251-001111 Ball End
Mill
: Karbida, 2
Flute
, 3/
64
"
Dia
meter
Mill
, 3/8" Loc, 2-1/2" Oal
MOQ: 2
Rp
1.255.254
Osg 403-1094-BN11 Ball End
Mill
: Karbida, Dilapisi TiAlN, 3 Alur,
Dia
meter
Mill
7/
64
", LOC 3/8", OAL 1-1/2"
MOQ: 2
Rp
2.005.592
Osg 404-2656-BN11 End
Mill
Ujung Bola: Karbida, Dilapisi Tialn, 4
Flute
,
Dia
meter
Mill
17/
64
", Loc 3/4", Oal 2-1/2"
MOQ: 2
Rp
1.776.872
Osg 404-2031-BN11 Ball End
Mill
: Karbida, Berlapis Tialn, 4 Alur,
Dia
meter
Mill
13/
64
", LOC 5/8", OAL 2-1/2"
MOQ: 2
Rp
1.247.212
Osg 404-1094-BN11 Ball End
Mill
: Karbida, Berlapis TiAlN, 4 Alur,
Dia
meter
Mill
7/
64
", Loc 3/8", OAL 1-1/2"
MOQ: 2
Rp
1.951.466
Osg 403-3150-BN11 Ball End
Mill
: Karbida, Berlapis Tialn, 3
Flute
,
Dia
meter
Mill
8 Mm, Loc 21 Mm, Oal
64
Mm
MOQ: 2
Rp
1.841.204
Osg 404-2362-BN11 Ball End
Mill
: Karbida, Berlapis Tialn, 4
Flute
,
Dia
meter
Mill
6 Mm, Loc 19 Mm, Oal
64
Mm
MOQ: 2
Rp
1.870.277
Osg 402-2362-BN11 Ball End
Mill
: Karbida, Berlapis TiAlN, 2
Flute
,
Dia
meter
Mill
6 Mm, LOC 19 Mm, OAL
64
Mm
Rp
3.242.442
Osg HP441-3150-BN Ball End
Mill
: Karbida, Berlapis Tialn, 4
Flute
,
Dia
meter
Mill
8 Mm, Loc 21 Mm, Oal
64
Mm
Pencarian Terkait "mill flute 64 dia"
mill
carbide
flute
64
mill
flute
11
64
mill
flute
19
64
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
Rp
3.213.524
Osg HP421-3150-BN Ball End
Mill
: Karbida, Berlapis TiAlN, 2
Flute
,
Dia
meter
Mill
8 Mm, Loc 21 Mm, OAL
64
Mm
MOQ: 2
Rp
2.016.107
Osg HP421-2362-BN Ball End
Mill
: Karbida, Berlapis Tialn, 2
Flute
,
Dia
meter
Mill
6 Mm, Loc 19 Mm, Oal
64
Mm
Rp
5.006.478
Osg 70100416 Pisau Frais Ujung Bola: Karbida, Berlapis Berlian, 2 Alur,
Dia
meter Pemotong 5/
64
", LOC 1/4", OAL 1-3/4"
Rp
4.717.756
Osg 70200416 Pisau Frais Ujung Persegi: Karbida, Berlapis Berlian, 2 Alur,
Dia
meter Pisau 5/
64
", Panjang Potong 1/4", Panjang Keseluruhan 1-3/4"
MOQ: 2
Rp
1.468.664
Osg 402-1406-BN11 Ball End
Mill
: Karbida, Berlapis Tialn, 2
Flute
, 9/
64
"
Dia
meter Pemotong, 1/2" Loc, 2" Oal
MOQ: 2
Rp
1.191.695
223-001055 Ball End
Mill
: Karbida, Dilapisi TiN, 4 Alur,
Dia
meter Pemotong 11/
64
", Panjang Potong 9/16", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.336.133
220-021065 Ball End
Mill
: Karbida, Berlapis TiCN, 4 Alur,
Dia
meter End
Mill
13/
64
", Panjang Pemotongan 3/8", Panjang Total 2"
MOQ: 2
Rp
1.200.355
220-021055 Ball End
Mill
: Karbida, Berlapis TiCN, 4 Alur,
Dia
meter Pemotong 11/
64
", Panjang Potong 5/16", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.180.870
220-011055 Pisau Frais Ujung Bola: Karbida, Berlapis TiN, 4
Flute
,
Dia
meter Frais 11/
64
", LOC 5/16", OAL 2"
MOQ: 2
Rp
1.344.639
219-021075 Pisau Frais Ujung Bola: Karbida, Berlapis Ticn, 2 Alur,
Dia
meter Frais 15/
64
", Panjang Potong 7/16", Panjang Total 2"
MOQ: 2
Rp
1.336.133
219-021065 End
Mill
Ujung Bola: Karbida, Berlapis TiCN, 2 Alur,
Dia
meter
Mill
13/
64
", LOC 3/8", OAL 2"
MOQ: 2
Rp
1.724.150
Osg 5667800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/32", Lokator 15/
64
", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.684.990
Osg 5667400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/32", Lokasi 9/
64
", Panjang Total 2"
MOQ: 2
Rp
1.643.167
Osg 5627900 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11/
64
", Lokator 1/4", Panjang Total 2"
MOQ: 2
Rp
1.643.167
Osg 5627800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 5/32", Lokator 15/
64
", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.643.167
Osg 5627700 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 9/
64
", Lokasi 7/32", Panjang Total 2"
MOQ: 2
Rp
1.643.167
Osg 5627500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 7/
64
", Lokasi 5/32", Panjang Total 2"
MOQ: 2
Rp
1.668.230
Osg 5627400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 3/32", Lokasi 9/
64
", Panjang Total 2"
MOQ: 2
Rp
1.643.167
Osg 5627300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 5/
64
", Lokator 1/8", Panjang Total 2"
MOQ: 2
Rp
1.757.985
Osg 5627100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 3/
64
", Lokator 1/16", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.761.901
Osg 5627000 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 1/32", Lokasi 3/
64
", Panjang Total 2"
Rp
3.645.668
Osg 404-484411 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 31/
64
", Lokasi 1", Panjang Total 3"
Rp
3.618.726
Osg 404-453111 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 29/
64
", Lok 1", Panjang Total 3"
Rp
3.645.668
Osg 402-484411 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 2 Alur,
Dia
meter Mata Bor 31/
64
", Lokasi 1", Panjang Total 3"
Rp
3.618.726
Osg 402-453111 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 2 Alur,
Dia
meter Mata Bor 29/
64
", Lokasi 1", Panjang Total 3"
MOQ: 2
Rp
1.372.491
Cleveland C76089 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,12", Jarak 23/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76087 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,1", Jarak 19/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.382.203
Cleveland C76084 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,09", Jarak 17/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76082 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,08", Jarak 15/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76079 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,07", Jarak 13/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.452.378
Cleveland C76075 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,06", Jarak 11/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.527.722
Cleveland C76073 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,05", Lok 9/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.527.722
Cleveland C76070 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,04", Lokator 7/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.589.596
Cleveland C76066 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,03", Lok 5/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.663.374
Cleveland C76063 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,02", Lokator 3/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.831.763
Cleveland C76057 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,01", Lokator 1/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76043 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,12", Jarak 23/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.382.203
Cleveland C76041 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,1", Jarak 19/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76038 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,09", Jarak 17/
64
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.440.473
Cleveland C76036 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,08", Jarak 15/
64
", Panjang Total 1-1/2"
1
3
4
5
6
7
13
Atas