Indonesia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "end mill cobalt dia"
Specification Tables
2 Hasil
Ball End Mills
1627 Items
Shank Diameter
1", 3/16", 1 1/4", 3/8", 1/2"
Flute Length
7/16", 0.4375", 1.375", 1 3/8", 1.3125", 1 5/16", 0.098", 4.2 mm
Overall Length
4 5/8", 4 3/4", 150 mm, 4 1/4", 2 1/2"
R Size
0.03", 0.19", 0.25", 0.06", 0.12"
Number of Flutes
7, 6, 3, 2, 4
Square End Mills
941 Items
Shank Diameter
3/8", 1/4", 7/8", 3/16"
Outer Diameter
1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32", 0.1875", 3/16"
Flute Length
0.75", 3/4", 1/2", 0.5", 3/8", 0.375", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
2, 5, 8, 6
Brands
2 Hasil
OSG
964 Produk
Cleveland
245 Produk
Produk
2,029 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 3 of 15
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
Rp
3.095.375
Osg 5260300 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter Pemotong 1/4", Loc 5/8", Panjang Keseluruhan 3-1/16"
Rp
8.093.501
Osg 5216100
End
Mill
Ujung Bola: Kobalt, 2 Flute,
Dia
meter
Mill
1-1/4", Loc 2-1/2", Oal 5"
MOQ: 2
Rp
2.022.865
Osg 5828400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 6,5 mm, Loc 1/2", Panjang Total 79,3 mm
MOQ: 2
Rp
1.999.212
Osg 5828300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 5,5 mm, Loc 1/2", Panjang Total 79,3 mm
MOQ: 2
Rp
1.712.716
Osg 5827400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 2 mm, Jarak 5,95 mm, Panjang Total 57,1 mm
Rp
5.453.151
Osg 5823200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 20 mm, Jarak 39,68 mm, Panjang Total 139,7 mm
Rp
3.973.832
Osg 5821400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 15 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.967.566
Osg 5821300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 14 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.911.645
Osg 5821200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 13 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.293.695
Osg 5821100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 12 mm, Jarak 20,63 mm, Panjang Total 95,2 mm
Rp
3.317.192
Osg 5820900 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11 mm, Jarak 20,63 mm, Panjang Total 95,2 mm
Rp
3.250.619
Osg 5820800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 10 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Keseluruhan 95,2 mm
MOQ: 2
Rp
1.941.099
Osg 5820500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 7 mm, Jarak 14,28 mm, Panjang Total 79,3 mm
MOQ: 2
Rp
1.918.542
Osg 5820200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 4 mm, Jarak 11,11 mm, Panjang Total 79,3 mm
Rp
4.213.649
Osg 5432100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/8", Lokasi 1-3/8", Panjang Total 5"
Rp
3.771.138
Osg 5431100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
3.291.503
Osg 5429700 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 15/32", Lokasi 1", Panjang Total 4-1/8"
Rp
3.390.656
Osg 5429600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/16", Lokasi 1", Panjang Total 4-1/8"
Rp
3.123.896
Osg 5429500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 13/32", Lokasi 1", Panjang Total 4-1/8"
Rp
3.689.684
Osg 5422100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/8", Lokasi 1-3/8", Panjang Total 5"
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
Rp
3.239.968
Osg 5421100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
4.529.751
Osg 5329800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 9/16", Jarak 1-3/8", Panjang Total 5"
Rp
3.689.684
Osg 5329600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 7/16", Lokasi 1", Panjang Total 4-1/8"
Rp
4.529.751
Osg 5322100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 5/8", Lokasi 1-3/8", Panjang Keseluruhan 5"
Rp
3.689.684
Osg 5321100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
4.952.369
Osg 5227500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 23/32", Lokasi 1-5/16", Panjang Total 5"
Rp
4.952.369
Osg 5227400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 21/32", Lokasi 1-5/16", Panjang Total 5"
Rp
4.626.086
Osg 5223100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 3/4", Lokasi 1-5/16", Panjang Total 5"
Rp
4.843.817
Cleveland C33000 Square
End
Mill
:
Cobalt
, Dilapisi Ticn, Ujung Ganda, 4 Flute,
Dia
meter
Mill
5/8", Loc 1-3/8"
Rp
11.822.967
Osg 5306400 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 2", Lokasi 2", Panjang Total 4-1/2"
Rp
11.146.433
Osg 5207400 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 2", Lokasi 2", Panjang Total 5-3/4"
Rp
14.543.511
Osg 4926100 Mata Bor Kasar: Kobalt, 6 Alur,
Dia
meter Mata Bor 2", Lokasi 2", Panjang Total 4-1/2"
Rp
6.065.149
Osg 4710000 Mata Bor Kasar: Kobalt, 5 Alur,
Dia
meter Mata Bor 1", Lokasi 1", Panjang Total 3-1/2"
Rp
4.147.547
Osg 5829300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 14,5 mm, Jarak Antar Mata Bor 28,57 mm, Panjang Total 114,3 mm
Rp
4.147.547
Osg 5829200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 13,5 mm, Jarak Antar Mata Bor 28,57 mm, Panjang Total 114,3 mm
Rp
3.374.052
Osg 5829100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 12,5 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Total 95,2 mm
Rp
3.374.052
Osg 5828900 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11,5 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Total 95,2 mm
Rp
3.319.855
Osg 5828800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 10,5 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Total 95,2 mm
MOQ: 2
Rp
1.712.716
Osg 5827500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 2,5 mm, Jarak Antar Mata Bor 7,14 mm, Panjang Total 57,1 mm
MOQ: 2
Rp
1.844.764
Osg 5827200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 1,5 mm, Jarak Antar Mata Bor 4,76 mm, Panjang Total 57,1 mm
Rp
5.435.154
YG-1 Tool Company 44426 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
1", Loc 4", OAL 6-1/2"
Rp
5.179.835
YG-1 Tool Company 43426 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
1", Loc 2", Oal 4-1/2"
Rp
10.327.503
YG-1 Tool Company 41478 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter Pisau 2", Loc 2-1/2", OAL 5"
Rp
3.878.033
Osg 5449700 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
7/16", Loc 1-1/4", OAL 3-1/4"
Rp
7.202.901
Osg 5444100 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
7/8", Loc 1-7/8", Oal 4-1/8"
Rp
5.431.597
Osg 5443100 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
3/4", Loc 1-5/8", Oal 3-7/8"
Rp
5.107.152
Osg 5442100 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
5/8", Loc 1-5/8", OAL 3-3/4"
Rp
3.956.129
Osg 5441100 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
1/2", Loc 1-1/4", Oal 3-1/4"
Rp
5.243.549
Osg 5263100 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter Frais 3/4", Loc 1-5/8", Oal 5-3/8"
Rp
4.737.550
Osg 5262100 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter
Mill
5/8", Loc 1-3/8", OAL 4-5/8"
Rp
4.530.016
Osg 5213100 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter
Mill
3/4", Loc 1-5/8", Oal 3-7/8"
Rp
4.725.797
Osg 5211500 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter
Mill
3/4", Loc 1-5/16", Oal 3-5/16"
Rp
4.011.956
Osg 5211300 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter
Mill
5/8", Loc 1-1/8", OAL 3-1/8"
MOQ: 2
Rp
2.003.128
Osg 5688000 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/16", Jarak 0,98", Panjang Total 3-3/8"
MOQ: 2
Rp
1.979.632
Osg 5687800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/32", Jarak 0,854", Panjang Total 3-1/4"
MOQ: 2
Rp
1.979.632
Osg 5687600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/8", Jarak 0,732", Panjang Total 3-1/8"
MOQ: 2
Rp
2.003.128
Osg 5687400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/32", Jarak 0,279", Panjang Total 2-5/8"
MOQ: 2
Rp
1.779.758
Osg 5678000 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/16", Jarak 0,48", Panjang Total 2-1/4"
MOQ: 2
Rp
1.779.758
Osg 5677800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/32", Jarak 0,417", Panjang Total 2-1/4"
MOQ: 2
Rp
1.773.179
Osg 5677600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/8", Jarak 0,362", Panjang Total 2-1/4"
1
2
3
4
5
15
Atas