Indonesia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "square mill tin"
Specification Tables
1 Hasil
Square End Mills
941 Items
Shank Diameter
3/8", 1/4", 7/8", 3/16"
Outer Diameter
1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32", 0.1875", 3/16"
Flute Length
0.75", 3/4", 1/2", 0.5", 3/8", 0.375", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
2, 5, 8, 6
Brands
2 Hasil
Cleveland
185 Produk
OSG
132 Produk
Produk
939 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 15 of 15
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
Rp
6.775.047
205-001261 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 3 Alur, Diameter Mata Bor 7/8", Jarak 1-1/2", Panjang Total 4"
Rp
6.812.641
204-001251 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur, Diameter Mata Bor 7/8", Jarak 1-1/2", Panjang Total 4"
Rp
6.833.787
YG-1 Tool Company 04212HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-1/2", Jarak 2", Panjang Total 4-1/2"
Rp
6.850.234
206-001251 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur, Diameter Mata Bor 7/8", Jarak 1-1/2", Panjang Total 4"
Rp
6.854.000
Osg EX-
TIN
-RESF End
mill
Mfl 25MM 88525
Rp
6.898.010
Cleveland C33688
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, Ujung Ganda, 2 Alur, Diameter Penggilingan 1"
Rp
6.900.000
Osg End
mill
EX-
TIN
-EMS 27MM 88237
Rp
6.900.000
Osg End
mill
EX-
TIN
-EMS 28MM 88238
Rp
6.918.217
YG-1 Tool Company 04218HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-3/4", Jarak 2", Panjang Total 4-1/2"
Rp
6.927.615
Cleveland C75060
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Flute, Diameter
Mill
1-3/8", Loc 2"
Rp
6.941.556
YG-1 Tool Company 08195HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1-1/4", Loc 4", Panjang Total 6-1/2"
Rp
6.953.931
206-001261 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1", Jarak 1-1/2", Panjang Total 4"
Rp
6.953.931
204-001261 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur, Diameter Mata Bor 1", Jarak 1-1/2", Panjang Total 4"
Rp
6.965.836
YG-1 Tool Company 73445CN Mata Bor Kasar: Kobalt, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-1/4", Loc 2", Panjang Total 4-1/2"
Rp
6.965.836
YG-1 Tool Company 73439CN Mata Bor Kasar: Kobalt, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-1/4", Loc 2", Panjang Total 4-1/4"
Rp
7.017.841
Cleveland C33233
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Flute, Diameter
Mill
1-1/4", Loc 2"
Rp
7.077.364
218-001101A Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur, Diameter Mata Bor 3/4", Jarak 1-1/2", Panjang Total 6"
Rp
7.077.364
216-001085 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur, Diameter Mata Bor 3/4", Jarak 1-1/2", Panjang Total 6"
Rp
7.114.332
Cleveland C33234
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Flute, Diameter
Mill
1-1/4", Loc 2"
Rp
7.149.419
Cleveland C33398
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Flute, Diameter
Mill
1", Loc 4", Panjang Total 6-1/2"
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
Rp
7.211.449
218-001082 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 6"
Rp
7.234.789
Osg 5425105 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 4 Alur, Diameter Mata Bor 1", Jarak 1-7/8", Panjang Total 6-3/8"
Rp
7.239.331
205-001271 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 3 Alur, Diameter Mata Bor 1", Jarak 1-1/2", Panjang Total 4"
Rp
7.240.898
Cleveland C32605
Square
End
Mill
: Cobalt, Dilapisi Timah, 4 Flute, Diameter
Mill
1-1/4", Loc 2", Panjang Total 4-1/2"
Rp
7.257.032
YG-1 Tool Company 09426CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1", Lokasi 6", Panjang Total 8-1/2"
Rp
7.268.780
216-001081 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 6"
Rp
7.284.601
Osg 6900705 Mata Bor Kasar: Baja Kecepatan
Tin
ggi, Lapisan Timah, 4 Alur, Diameter Mata Bor 5/8", Jarak 2-1/2", Panjang Total 4 5/8"
Rp
7.418.529
Osg 6901305 Mata Bor Kasar: Baja Kecepatan
Tin
ggi, Lapisan Timah, 4 Alur, Diameter Mata Bor 3/4", Jarak 1-5/8", Panjang Total 3 7/8"
Rp
7.467.401
Cleveland C32669 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1", Jarak 4", Panjang Total 6-1/2"
Rp
7.507.814
Osg 5225105 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 2 Alur, Diameter Mata Bor 1", Jarak 1-5/8", Panjang Total 5-7/8"
Rp
7.518.153
Cleveland C33399
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Flute, Diameter
Mill
1-1/8", Loc 4"
Rp
7.569.218
Cleveland C75059
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Flute, Diameter
Mill
1-3/8", Loc 1-3/8"
Rp
7.624.982
YG-1 Tool Company 07211HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1-1/2", Loc 2", Panjang Total 4-1/2"
Rp
7.709.255
Osg 6901705 Mata Bor Kasar: Baja Kecepatan
Tin
ggi, Lapisan Timah, 5 Alur, Diameter Mata Bor 7/8", Jarak 1-7/8", Panjang Keseluruhan 4-1/8"
Rp
7.716.000
Osg End
mill
EX-
TIN
-RELF 22MM 88422
Rp
7.760.633
Cleveland C75061
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Flute, Diameter
Mill
1-1/2", Loc 1-3/8"
Rp
7.841.303
YG-1 Tool Company 04220HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-3/4", Jarak 2", Panjang Total 4-1/2"
Rp
7.991.366
Cleveland C33800
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 2 Flute, Diameter
Mill
1-1/2", Loc 1-5/8"
Rp
8.045.094
YG-1 Tool Company 08446CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-1/4", Loc 4", Panjang Total 6-1/2"
Rp
8.063.107
YG-1 Tool Company 01598TN Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur, Diameter Mata Bor 3/4", Lok 1-1/2", Panjang Total 4"
Rp
8.085.037
YG-1 Tool Company 07598TN Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur, Diameter Mata Bor 3/4", Lok 1-1/2", Panjang Total 4"
Rp
8.093.183
Cleveland C33235
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Flute, Diameter
Mill
1-3/8", Loc 2"
Rp
8.281.935
Cleveland C33452
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Flute, Diameter
Mill
1", Loc 6", Panjang Total 8-1/2"
Rp
8.293.683
YG-1 Tool Company 04228HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Alur, Diameter Mata Bor 2", Lok 2", Panjang Total 4-1/2"
Rp
8.335.000
Osg End
mill
EX-
TIN
-EMS 30MM 88240
Rp
8.542.743
218-001083 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur, Diameter Mata Bor 3/4", Lokasi 4", Panjang Total 7"
Rp
8.668.056
YG-1 Tool Company 04226HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 8 Alur, Diameter Mata Bor 2", Lok 2", Panjang Total 4-1/2"
Rp
8.997.786
Cleveland C32712
Square
End
Mill
: Cobalt, Dilapisi Timah, 4 Flute, Diameter
Mill
1", Loc 6", Panjang Total 8-1/2"
Rp
9.031.307
Osg 6910105 Mata Bor Kasar: Baja Kecepatan
Tin
ggi, Lapisan Timah, 5 Alur, Diameter Mata Bor 1", Lokasi 2", Panjang Total 4-1/4"
Rp
9.041.645
Osg 6901505 Mata Bor Kasar: Baja Kecepatan
Tin
ggi, Lapisan Timah, 4 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
9.128.111
215-001091 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1", Jarak 2-1/4", Panjang Total 5"
Rp
9.128.111
213-001091 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur, Diameter Mata Bor 1", Jarak 2-1/4", Panjang Total 5"
Rp
9.137.979
YG-1 Tool Company 73461CN Mata Bor Kasar: Kobalt, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-1/2", Loc 2", Panjang Total 4-1/2"
Rp
9.137.979
YG-1 Tool Company 73457CN Mata Bor Kasar: Kobalt, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-1/2", Loc 2", Panjang Total 4-1/4"
Rp
9.305.899
Cleveland C33236
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Flute, Diameter
Mill
1-1/2", Loc 2"
Rp
9.367.146
YG-1 Tool Company 08212HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Alur, Diameter Mata Bor 1-1/2", Jarak 4", Panjang Total 6-1/2"
Rp
9.367.146
YG-1 Tool Company 08211HN Mata Bor Ujung Persegi: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1-1/2", Jarak 4", Panjang Total 6-1/2"
Rp
9.371.062
Cleveland C75065
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Flute, Diameter
Mill
1-3/4", Loc 1-3/8"
Rp
9.543.210
Cleveland C75064
Square
End
Mill
: Baja Kecepatan
Tin
ggi, Dilapisi Timah, 6 Flute, Diameter
Mill
1-1/2", Loc 4"
Rp
9.725.541
Osg 6910905 Mata Bor Kasar: Baja Kecepatan
Tin
ggi, Lapisan Timah, 5 Alur, Diameter Mata Bor 1", Lokasi 4", Panjang Total 6-1/2"
1
11
12
13
14
15
Atas