Indonesia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "32 dia loc"
Specification Tables
3 Hasil
Radius End Mills
3367 Items
Shank Diameter
7/32", 9/32", 5/8", 1/4", 3/4"
Outer Diameter
0.3125", 5/16", 0.125", 1/8", 1/8", 0.125", 1/16", 0.0625", 1/32", 0.03125"
Flute Length
1.23", 0.0268", 0.0398", 0.0531", 3/16", 0.1875"
Overall Length
115 mm, 3 1/4", 4 1/4", 2 1/4", 6"
R Size
0.015", 0.02", 0.0156", 0.0313", 0.0469"
Ball End Mills
1627 Items
Shank Diameter
1", 3/16", 1 1/4", 3/8", 1/2"
Flute Length
7/16", 0.4375", 1.375", 1 3/8", 1.3125", 1 5/16", 0.098", 4.2 mm
Overall Length
4 5/8", 4 3/4", 150 mm, 4 1/4", 2 1/2"
R Size
0.03", 0.19", 0.25", 0.06", 0.12"
Number of Flutes
7, 6, 3, 2, 4
Square End Mills
941 Items
Shank Diameter
3/8", 1/4", 7/8", 3/16"
Outer Diameter
1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32", 0.1875", 3/16"
Flute Length
0.75", 3/4", 1/2", 0.5", 3/8", 0.375", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
2, 5, 8, 6
Brands
4 Hasil
OSG
472 Produk
YG-1 TOOL COMPANY
253 Produk
APPROVED VENDOR
247 Produk
Cleveland
107 Produk
Produk
1,085 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 13 of 15
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
MOQ: 2
Rp
1.382.203
Cleveland C76081 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,078", Lokator 7/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.440.473
Cleveland C76080 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,075", Lokator 7/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.535.554
Cleveland C76074 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,055", Lok 5/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.454.258
Cleveland C76069 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,035", Lokator 3/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.589.596
Cleveland C76068 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,033", Lokator 3/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.806.074
Cleveland C76062 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 0,015", Lokator 1/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76040 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,095", Lok 9/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.440.473
Cleveland C76035 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,078", Lokator 7/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.375.310
Cleveland C76034 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,075", Lokator 7/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.527.722
Cleveland C76028 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,055", Lok 5/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.527.722
Cleveland C76023 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,035", Lokator 3/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.677.158
Cleveland C76022 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 0,033", Lokator 3/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.324.402
YG-1 Tool Company 31561TF Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 5/
32
",
Loc
5/16", Panjang Keseluruhan 2"
MOQ: 3
Rp
791.509
YG-1 Tool Company 31556 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 3/
32
",
Loc
3/16", Panjang Total 1-1/2"
MOQ: 2
Rp
1.242.792
YG-1 Tool Company 07561TN Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur,
Dia
meter Mata Bor 5/
32
",
Loc
9/16", Panjang Total 2"
MOQ: 2
Rp
1.240.442
YG-1 Tool Company 07561TF Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 5/
32
",
Loc
9/16", Panjang Keseluruhan 2"
MOQ: 3
Rp
775.531
YG-1 Tool Company 07556 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 3/
32
",
Loc
3/8", Panjang Total 1-1/2"
MOQ: 2
Rp
1.242.792
YG-1 Tool Company 01562TN Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur,
Dia
meter Mata Bor 5/
32
",
Loc
9/16", Panjang Keseluruhan 2"
MOQ: 2
Rp
1.324.402
YG-1 Tool Company 01562TF Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 2 Alur,
Dia
meter Mata Bor 5/
32
",
Loc
9/16", Panjang Keseluruhan 2"
MOQ: 3
Rp
781.797
YG-1 Tool Company 01556 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 3/
32
",
Loc
3/8", Panjang Total 1-1/2"
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
MOQ: 2
Rp
1.407.422
Osg HP455-2188 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 5 Alur,
Dia
meter Mata Bor 7/
32
", Lok 5/8", Panjang Total 2-1/2"
Rp
2.890.658
Osg HP441-2812 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 9/
32
", Lokator 3/4", Panjang Total 2-1/2"
Rp
2.890.658
Osg HP421-2812 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 2 Alur,
Dia
meter Mata Bor 9/
32
", Lokator 3/4", Panjang Total 2-1/2"
Rp
3.689.684
Osg 5742808 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, Dilapisi Ticn, 6 Alur,
Dia
meter Mata Bor 27/
32
", Lokasi 1-7/8", Panjang Total 4"
Rp
3.858.544
Osg 5742608 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, Dilapisi Ticn, 6 Alur,
Dia
meter Mata Bor 25/
32
", Lokasi 1-7/8", Panjang Total 4"
Rp
3.137.368
Cleveland C33748 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, 2 Alur,
Dia
meter Mata Bor 17/
32
", Jarak 1-1/8", Panjang Total 3-3/8"
MOQ: 2
Rp
1.736.838
Cleveland C33373 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, 4 Alur,
Dia
meter Mata Bor 9/
32
", Jarak 1-3/8", Panjang Total 3-1/8"
Rp
4.440.466
Cleveland C33167 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, 4 Alur,
Dia
meter Mata Bor 23/
32
", Jarak 1-5/8", Panjang Total 3-7/8"
Rp
3.361.364
Cleveland C33163 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, 4 Alur,
Dia
meter Mata Bor 19/
32
", Jarak 1-3/8", Panjang Total 3-3/8"
MOQ: 2
Rp
1.875.622
Cleveland C33158 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, 4 Alur,
Dia
meter Mata Bor 15/
32
", Jarak 1-1/4", Panjang Total 3-1/4"
Rp
7.954.321
Wi
dia
Hanita 4XNEM16006RPT WS15PE End Mill Radius Sudut: Karbida, Berlapis Altin, 4 Flute,
Dia
meter Mill 16 Mm,
LOC
32
Mm
Rp
7.954.321
Wi
dia
Hanita 4XNEM16006RKT WS15PE Corner Radius End Mill: Karbida, Berlapis Altin, 4 Flute,
Dia
meter Milling 16 mm,
LOC
32
mm
Rp
7.954.321
Wi
dia
Hanita 4XNEM16006RET WS15PE End Mill Radius Sudut: Karbida, Berlapis Altin, 4 Flute,
Dia
meter Mill 16 Mm,
Loc
32
Mm
Rp
6.121.226
Osg 3182680 Mata Bor Ujung Persegi: Karbida, Dilapisi Wxl, 2 Alur,
Dia
meter Mata Bor 8 mm, Jarak
32
mm, Panjang Total 80 mm
Rp
12.474.594
Osg 3182160 Mata Bor Ujung Persegi: Karbida, Dilapisi Wxl, 2 Alur,
Dia
meter Mata Bor 16 mm, Jarak
32
mm, Panjang Total 90 mm
Rp
4.250.147
Osg 5403500 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 31/
32
", Jarak 1-7/8", Panjang Total 4-1/8"
Rp
4.255.943
Osg 5403400 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 29/
32
", Jarak 1-7/8", Panjang Total 4-1/8"
Rp
3.346.640
Osg 5401900 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 23/
32
", Jarak 1-5/8", Panjang Total 3-5/8"
Rp
3.159.454
Osg 5401800 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 21/
32
", Jarak 1-5/8", Panjang Total 3-5/8"
Rp
3.006.415
Osg 5401700 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 19/
32
", Jarak 1-3/8", Panjang Total 3-3/8"
Rp
3.120.920
Osg 5201700 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 19/
32
", Jarak 1-1/8", Panjang Total 3-1/8"
Rp
2.942.976
Osg 5201600 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 17/
32
", Jarak 1-1/8", Panjang Total 3-1/8"
MOQ: 2
Rp
1.465.379
Osg 424-109411 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/64",
Loc
7/
32
"
MOQ: 2
Rp
1.805.604
Osg 424-031211 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/
32
",
Loc
5/64"
MOQ: 2
Rp
1.073.463
Osg 414-0938 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 3/
32
", Lokator 3/16", Panjang Total 1-1/2"
MOQ: 2
Rp
1.120.768
Osg 414-0781 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 5/64", Lok 5/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.114.816
Osg 414-0469 Mata Bor Ujung Persegi: Karbida, 4 Alur,
Dia
meter Mata Bor 3/64", Lokator 3/
32
", Panjang Total 1-1/2"
MOQ: 2
Rp
1.073.776
Osg 412-0938 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 3/
32
", Lokator 3/16", Panjang Total 1-1/2"
MOQ: 2
Rp
1.114.816
Osg 412-0781 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 5/64", Lok 5/
32
", Panjang Keseluruhan 1-1/2"
MOQ: 2
Rp
1.120.768
Osg 412-0469 Mata Bor Ujung Persegi: Karbida, 2 Alur,
Dia
meter Mata Bor 3/64", Lokator 3/
32
", Panjang Total 1-1/2"
Rp
3.193.915
Cleveland C33445 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill 13/
32
",
Loc
2-3/4"
Rp
2.899.899
Cleveland C33439 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill 7/
32
",
Loc
1-3/4"
MOQ: 2
Rp
1.837.089
Cleveland C33389 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill 11/
32
",
Loc
1-1/2"
MOQ: 2
Rp
1.844.138
Cleveland C33387 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill 9/
32
",
Loc
1-3/8"
Rp
3.579.566
Cleveland C3
32
10 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill 19/
32
",
Loc
1-3/8"
Rp
3.598.989
Cleveland C3
32
08 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill 17/
32
",
Loc
1-3/8"
Rp
2.832.074
Cleveland C3
32
05 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill 15/
32
",
Loc
1-1/4"
MOQ: 2
Rp
1.857.609
YG-1 Tool Company 12317 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 15/
32
",
Loc
1", Panjang Total 4-1/8"
MOQ: 2
Rp
1.844.764
YG-1 Tool Company 12309 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 13/
32
",
Loc
1", Panjang Total 4-1/8"
MOQ: 2
Rp
1.293.230
YG-1 Tool Company 07066 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, 4 Alur,
Dia
meter Mata Bor 15/
32
",
Loc
1", Panjang Total 2-11/16"
1
11
12
13
14
15
Atas