Major and minor in-hanger overhaul and servicing of electrical equipment including control looms, supply systems,interconnections and relays, lighting and audiovisual3.
Specifications
Phillips [No] :PH1
Length [mm] :25
S$ 4.68
Lead time of 90 working days required.
Item will be ready to dispatch within the lead time specified.